PlumbingDrainage piping & fittingsLevel 22018 UPC

Kitchen sink drop in the basement ceiling

Unfinished basement ceiling below a kitchen. A 3 in. white PVC drain hangs on straps under the floor joists, running from a threaded cleanout plug at the left end to a sanitary tee on a vertical 3 in. stack at the right. Partway along, a 2 in. PVC pipe drops straight down through the subfloor between two joists and connects to the horizontal drain at a tee fitting. Red and blue PEX run along the rim joist, and metal shelving with paint cans stands against the poured concrete foundation wall below a basement window. 3 IN PVC DWV SCH 40 ASTM D2665 3 IN PVC DWV SCH 40 2 IN PVC DWV
Basement ceiling below the kitchen, drain-waste-vent rough-in

What's wrong here?

  1. The vertical drop from the kitchen enters the horizontal drain through a sanitary tee
  2. The horizontal drain may not join the stack through a sanitary tee
  3. A line serving a kitchen sink needs a cleanout at its upper end
  4. Nothing. This installation is compliant
Start this drill
Show the answer and the code reference

The answer

The 2 in. kitchen drop turns from vertical to horizontal through a sanitary tee laid on its back. A vertical-to-horizontal change must be made with a wye, a combination wye and 1/8 bend, or another approved fitting of equivalent sweep.

Correct choice: 1. The vertical drop from the kitchen enters the horizontal drain through a sanitary tee

UPC 706.4 says vertical drainage lines connecting with horizontal drainage lines must enter through 45-degree wye branches, combination wye and 1/8 bend branches, or other approved fittings of equivalent sweep. The sanitary tee is not on that list, even though 706.2 allows it where a horizontal line enters a vertical stack. Waste falling down the drop hits the bottom of the horizontal line almost head-on, so it splashes back up the run toward the cleanout and slows the flow, which leads to buildup and stoppages. Note the contrast in this picture: the same fitting is legal at the stack and illegal at the drop.

How to fix it

Cut out the tee and install a 3 x 2 combination wye and 1/8 bend (or a wye with a 1/8 bend on the branch) set with its branch rolled up to vertical and sweeping toward the stack. Keep the run sloped at least 1/4 in. per ft toward the stack.

Code references

  • UPC 2018 706.4 — Vertical to Horizontal

    Vertical drainage lines connecting with horizontal drainage lines are to enter through 45-degree wye branches, combination wye and 1/8 bend branches, or other approved fittings of equivalent sweep.

    Drills citing 706.4
  • UPC 2018 706.2 — Horizontal to Vertical

    Horizontal drainage lines connecting with a vertical stack may enter through 45-degree wye branches, combination wye and 1/8 bend branches, sanitary tee or sanitary tapped tee branches, or other approved fittings of equivalent sweep.

    Drills citing 706.2

Minnesota

MN adopts this rule as writtenConfidence: medium

Minnesota adopts the 2018 Uniform Plumbing Code with Minnesota amendments as the Minnesota Plumbing Code (Minn. Rules ch. 4714, effective Dec. 17, 2021). No Minnesota amendment to 706.4 is known; check ch. 4714 before relying on it. Search-result excerpts point to a Minnesota Plumbing Board interpretation (reported as PB0183, October 2024) that allows long-sweep and short-sweep quarter bends and listed long-pattern fittings for horizontal-to-horizontal and vertical-to-horizontal changes; it could not be read. Even if accurate, it widens the bends allowed and does not add the sanitary tee.

About the Minnesota Plumbing Code

Citation under review. Confirm the Minnesota Plumbing Board interpretation in the Minnesota note (reported as PB0183, Oct. 15, 2024) and its wording on quarter bends for 706.3/706.4; it comes from search-result snippets only. Also confirm whether Minnesota's amended 707.4 (apparently Minn. Rules 4714.0707) keeps cleanouts for kitchen sink lines above the lowest floor. The cleanout distractor no longer depends on it because a cleanout is drawn, and the answer rests on the model 706.4 text.

Why the other choices are wrong

  • The horizontal drain may not join the stack through a sanitary tee. UPC 706.2 lists the sanitary tee for horizontal-to-vertical connections. The tee at the stack is correct; the problem is the tee where flow turns from vertical to horizontal.
  • A line serving a kitchen sink needs a cleanout at its upper end. Whether or not this line needs one (Minnesota's amended 707.4 is reported to keep cleanouts for kitchen sink lines even above the lowest floor), it has one: the threaded plug at the left end of the run is an upper-terminal cleanout.
  • Nothing. This installation is compliant. A sanitary tee set on its back so that a vertical line enters a horizontal drain is not one of the fittings 706.4 permits for a vertical-to-horizontal change of direction.
Code complianceLevel 2 · Journeyman#change of direction#sanitary tee#vertical to horizontal#fittings#basement#kitchen